The management stipulation of the demonstration
and the display builds
 

01¡¢All demonstrations, the display and the arrangement must conform to the Shanghai international convention center correlation security stipulation and the People's Republic of China fire prevention security rule and the Shanghai special profession and the public place act of administration.According to public security department's request, every has the stir effect or the activity which opens to the public, must report to the public security department, hands over Shanghai the international convention center to set up a file.

02¡¢
All demonstrations display product, the arrangement builds the facility, the equipment and other goods turnover must by the special-purpose channel turnover, ship the time to have beforehand to be coordinated with the Shanghai international convention center. The goods turnover, should be carried out strictly according to the Shanghai international convention center goods turnover system. Please provide leads the equipment the detailed list, in order to checkup when carries over time the Shanghai international convention center. When demolition display, does not have to unfold the Shanghai international convention center has, the furniture and so on carries outside the hall. If violates, carries on the fine according to initial cost ten times.

03¡¢
The builds the construction blueprint must be supposed to Shanghai international convention center' peace preservation department to verificat before construction 7 days,if pass the verification, builds business must have strictly according to the chart construction,does not have to change at will; Special repair(the area bigger than 36 square meters) should be provide the detailed repair blueprint before 15 days.

04¡¢
In order to protect the location, The stage, the background board, the light and the sound responsibly will build and provide by the Shanghai international convention center, like has the special request but the Shanghai international convention center to be unable to satisfy, must have beforehand the design proposal and the location protection plan submits the Shanghai international convention&exhibition co.,ltd., after agreed can enter the arena carries on the arrangement,and pays the management fee. Special repair unit,must build the plan (to attach effect chart) and the electricity consumption application delivers Shanghai international convention&exhibition co.,ltd., after the process permission can carry on the construction.

05¡¢
Before enter the center, the builds business have to pay the deposit of builds and the deposit of construction card, the location to be approved by Shanghai international convention&exhibition co.,ltd. after the display or the conference ended,if the Shanghai international convention center does not have the damage and all goods on time evacuates, the deposit returns the sum total.

01)
The builds business must pay the builds deposit to Shanghai international convention&exhibition co.,Ltd. If the deposit has not been received, then does not accept any procedure of enters the arena, the influence activity normal convention consequence by builds business to be responsible voluntarily.
£ £ 
02)
The builds deposit's charge standard is: the Shanghai hall deposit is not lower than 20,000 Yuan, the exhibition hall (the Huaxia hall) the deposit is not lower than 10,000 Yuan(In the exhibition hall stall pays the deposit according to the area size 2000-5000 to be different), the International hall,the Pearl hall,the Yellow River hall,the Yangtze River hall,the Pujiang hall,the century hall's deposit is not lower than 5,000 Yuan, other small conference site deposit are not lower than 2,000 Yuan;The dining room like the European hall,the Asian hall,the Bin Jiang hall's the deposit of the marriage celebrates builds is not lower than 5,000 Yuan.

03) Enters the arena the construction card: Each deposit 50 RMB(Provides the effective ID card copy)
£ £ 
04)
Above stipulated refers gathers the deposit lowest quota,if specially builds, the concrete amount in accordance with the situation to decides.

06¡¢The constructor is entering the Shanghai international convention center to have to wear enters the arena the construction card,must be a person a card, if violates, will be confiscated. The arena the construction card after to pay the deposit,to build the management fee and the battery case meets the barge fee to provide.

07¡¢The time of enters the arena: Stipulated according to the Shanghai police unit, the freight vehicle comes in or goes out the Shanghai international convention center after 22:00PM, also must carry the pass with the vehicle(Solves by the active sponsor unit).

08¡¢The freight vehicle Ships the stall to build and arrangement material must stop in the Shanghai international convention center 7 gates, the cargo enters from this the gate.

09¡¢In order to avoid damaging in the Shanghai international convention center the marble ground, any climb up enters the Shanghai international convention have to use the soft material package with the motion arm rest ladder base, handcart turn of request stone rubber material. All the builds material have to use does not burn or is flame-resistant the material, the rug must use the fire protection rug, strictly prohibits the use flammable cystosepiment, not and so on builds the material after the fire protection processing lignin plate and the petroleum chemical industry series plastic plate. Builds the goods to strictly prohibit from the escalator transporting, In builds, unfolds in the position arrangement, the material transportation in process, the facility ground must take protective measures and so on the carpet or shop plank, strictly prohibits doing the facility facility the working point use.

10¡¢In builds in the process, All conference rooms and the entrance hall region wall, the pillar,the ceiling and the floor do not have to post, the nail pastes, theburrow, the oblate, spreads the color, ascends steps on, removes changes, delimits the mark and the damage, all structure must have the independent strut. Like has violates, Shanghai international convention&exhibition co.,ltd. will according to damages the degree (unit) to demand the economical compensation and the economical fine to the litigant.

11¡¢If the hangs spot must be put in the facility, the builds have beforehand to explain receives hangs the weight to Shanghai international convention&exhibition co.,ltd. After the department concerned verifies the agreement, Supervises under the coordination in the Shanghai international convention center engineering dept personnel to be able to construct.

12¡¢If the unfolds,unfolds has and the installment electric appliance, the telecommunication equipment builds in the Shanghai international convention center must be modified, please with Shanghai international convention center scene service department relation, unifies the installment by the scene service department, removes the attire, shifting.

13¡¢The ground load-bearing of exhibition hall and the conference site cannot surpass each square meter 300 kilograms, the gate inside dimension please refer to the conference site introduction. The big-ticket item goods enter the Shanghai international convention center to have beforehand to apply.

14¡¢the request of use electricity:

01) The installment of electrical line and the equipment should be operated by the electrician hold the card; The wire should use the plastic to protect the pallial line, the attachment should use insulates four attachments; The electric wire, the electric cable cross when the ground should have the protection.

02) The display and the stage build strictly prohibits the use high efficiency halogen tungsten lamp, the neon light and the colored thread, the lamps and lanterns arrangement and the inflammable goods should maintain 50 centimeters equal-spaces; if unfolds in the board and the stage has the light power source,then must pass through fire protection coating processing.

03) Reported the electricity consumption should tally builds and moves theactual need, otherwise will not handle <Uses electricity the request form>.

04) the total quantity of builds and in the active reality uses electricity not to have to surpass the forecast electric quantity, the electrical line capacity equipment should be balanced, The line arrangement must standard, each return route meets the attire current collector sum total not to have to surpass its biggest load, like has violates, Shanghai international convention&exhibition co.,ltd. is authorized to stop supplying power.

05) All specially brings the electric appliance (lamps and lanterns, plug,power switch) does not have voluntarily the wiring circular telegram.

06) Please first handles to Shanghai international convention&exhibition co.,ltd. builds the management fee, uses electricity applies and the cleaning location deposit,then handles to Peace preservation department related enters the arena the procedure.

15¡¢The request of channel: Unfolds build and the stage and so on position, exhibit article,billboard builds does not have to cover and to affect involves in the region the fire fighting equipment use; Disperses the channel the span not to be smaller than 3 meters, the channel in after the exhibition hall or the conference site unfolds the position width many in 0.6 meter, In the exhibition hall must keep above 3 to lead to outdoor secret channel; After the Shanghai hall stage builds the channel not to be smaller than 3.5 meters, among the conference site arrangement the main channel is not smaller than 4 meters, the inferior channel is not smaller than 3 meters; other conference facility stages, the background the channel is not smaller than 1 meter. Above all channels should maintain throughout unimpededly, does not have to pile the thing, all securities disperse the gate all to be supposed to open, does not have to stop up, all builds should keep the fire facility emergency use to open the distance.

16¡¢In the exhibition hall and the conference site does not have to take the millwork plant, only can carry on the installment, the installation work.

17¡¢Mechanical exhibit article like diesel locomotive, automobile,motorcycle and each kind of steam, diesel engine and so on£¬displays when the facility does not have to carry on the operation and the service, the fuel tank should clear be spatial, the storage battery must demolish.

18¡¢Strictly prohibits the flammable high explosive cargo, chemistry dangerous material, the virulent noxious gas and the radioactive goods enters the Shanghai international convention center. Like has the special need, should enter the Shanghai international convention center preceding
month to hand in the application to the public security department, and provides the detailed material to set up a file. After the public security department makes the safe appraisal and the protective measure, only enter the place which Shanghai international convention center assigns.

19¡¢Strictly prohibits setting off the fireworks firecracker inside and outside the Shanghai international convention center, strictly prohibits using the open fire in the Shanghai international
convention center, The constructor does not have (including toilet) in to smoke in the facility.

20¡¢After builds completes, the packing material and other surplus goods should promptly clean up the facility.

21¡¢The prohibition carries food (including box lunch, drink, fruit and so on) enters the Shanghai international convention center.

22¡¢The builds business must understand<the management stipulation of the demonstration and the display builds>of Shanghai international convention&exhibition co.,ltd. like has violates, Shanghai international convention&exhibition co.,ltd. will build business to demand the economical compensation.